Skip to content
BOL Conferences
Thread Options
#1755506 - 11/06/12 05:03 PM Construction Perm 2 X Close
Patricia Offline
Gold Star
Joined: Mar 2011
Posts: 335
Kansas
The rate during construction and the rate for the perm loan are the same. The bank does not have a lock-in agreement. So do I use the date the application was received at time of construction, which was 12 months ago. (A new application was not obtained for the perm loan?)

Return to Top
HMDA

   
HMDA Academy
#1756437 - 11/08/12 05:18 PM Re: Construction Perm 2 X Close Patricia
Patricia Offline
Gold Star
Joined: Mar 2011
Posts: 335
Kansas
bump

Return to Top
#1756478 - 11/08/12 06:35 PM Re: Construction Perm 2 X Close Patricia
Sheba Offline
Member
Sheba
Joined: Mar 2002
Posts: 78
Oz
I am assuming that you are looking to document a lock-in date. If you use commitment letters, I would suggest using the date the customer signed the commitment letter and agreed to loan terms. However, if this is a secondary market loan there should be documentation of the lock-in. Hope this helps.

Return to Top

Moderator:  SMQ, CRCM