Refer your auditor to the infamous RESPA FAQs:
12) Q: If a revised GFE is provided due to changed circumstances or a borrower requested change, must a loan originator complete Line 2 in the ―Important Dates‖ section on the revised GFE if the shopping period has ended and the borrower has already expressed intent to continue with the application?
A: Yes, the loan originator must complete Line 2 in the ―Important dates‖ section with the same date from the last GFE. The borrower is not required to re-indicate the intent to proceed with the revised GFE because the borrower has previously expressed an intent to move forward with the transaction.
_________________________
CRCM