The standard at our bank is 14 days for the Closing Cost Expiration instead of 10. We never close a loan within the first 10 days, but have had loans close between days 11 and 14. In this scenario, is it a regulatory issue that the loan closed prior to the closing cost expiration date?
Thank you.