Most Popular Lending Content
Pledging a Jointly Owned CD as Collateral
11/17/2003
When a Joint CD is used as a collateral on a loan must both parties pledge the collateral or is the one borrowing the money the only one necessary? If a loan is secured by a CD the has a POD on it must the POD pledge the collateral also for the loan?
HOEPA Triggers for 2004
11/17/2003
What is the total fee and point figure under HOEPA for 2004?
Variable Rates on Consumer Construction
11/17/2003
Can we use variable rates for consumer residential construction loans? We've been told by consultants that consumer construction loans HAVE to be fixed rate.
Perfecting a Lien on Aircraft
11/17/2003
What is necessary to perfect a lien on aircraft? Does something have to be filed with the FAA?
Calculating APR and Payment Stream
11/17/2003
I am trying to verify for an auditor that we are calculating the APR and payment stream correctly on the final TIL. The loan I am working with is a 3/1 ARM mortgage loan. I disclosed the first 36 payments based on the original contract rate, the remaining payments were based on the current index plus the margin for the balance of the term of the loan. The new rate was actually less than the contract rate since the index is so low at this time. I am confident this is correct and have verified it with our doc prep company - but no one has been able to show me this in writing. I have been reading Reg Z, the Commentary, and anything else I can find - but so far I can only find info on the initial disclosure and not the final disclosure. Where can I find and print the correct procedure for calculating the APR and payment stream that is to be disclosed on the final TIL ???